Data Summary

Unit20182019202020212022
Energy used at QGO and APB Centre
Electricity consumed[1]kWh4,954,4294,815,7544,256,3713,699,4153,863,227
Electricity intensity[1]kWh/m2196190125109113
CO2 emission equivalent to electricity consumption[2]Tonne CO2-e3,2843,2012,2921,9212,008
Total Electricity consumed per employee kWh/employee2,5982,4562,0951,8121,778
Total CO2 emission equivalent to electricity consumption per employee[2]Tonne CO2-e/ employee1.7221.5581.0410.8850.924
Energy saved by projects[3]
Total energy saving due to green and low-carbon designGWh2.524.311.03.515.6
CO2 emission equivalentKilotonne CO2-e1.817.07.72.410.9
No. of certified green buildings or under application[4]
Certified green buildings against third-party standardNumber6713127
Active projects seeking green building certifications against third-party standardNumber5856566953
[1]

Offices at QGO and APB Centre represent a majority of total ArchSD office space. The percentage of electricity consumption of the whole premises for ArchSD office at APB Centre & QGO is assumed to be 100% and 20% respectively.

[2]

CO2 emissions intensity of CLP Power and HK Electric from 2018 to 2022 were used for ArchSD office at APB Centre & QGO respectively.

[3]

Energy saving is calculated by considering green and low carbon design features, e.g. building envelope, building services systems and renewable energy technologies, adopted in projects.

[4]

‘Third-party standards’ refers to BEAM Plus certified by Hong Kong Green Building Council.

Unit20182019202020212022
Fuel consumption by ArchSD pool carsLitre14,68614,55613,19713,54311,463
GHG emissions equivalent to fuel consumption by ArchSD pool cars[5]Tonne CO2-e39.839.435.736.631.0
NOx emissions equivalent to fuel consumption by ArchSD pool cars[6]kg10.4569.9758.2008.0177.509
SOx emissions equivalent to fuel consumption by ArchSD pool cars[6]kg0.2160.2140.1940.1990.169
PM emissions equivalent to fuel consumption by ArchSD pool cars[6]kg0.7700.7340.6040.5900.553
Total Fuel consumption by ArchSD pool cars per employeeLitre/employee7.701 7.4236.495 6.632 5.275
Total GHG emissions equivalent to fuel consumption by ArchSD pool cars per employeeTonne CO2-e/ employee0.0210.0200.018 0.018 0.014
[5]

GHG emission factors for mobile combustion are based on the Guidelines to Account for and Report on Greenhouse Gas Emissions and Removals for buildings (Commercial, Residential or Institutional Purpose) in Hong Kong, 2010 Edition.

[6]

Air pollutant emission factors for mobile combustion are based on The Hong Kong Environmental Protection Department’s (“EPD”) EMFAC-HK Vehicle Emission Calculation model and the United States Environmental Protection Agency’s Vehicle Emission Modeling Software - MOBILE6.1

Unit20182019202020212022
Water consumption by ArchSD[7]m315,92313,10913,83714,24713,611
[7]

Offices at QGO and APB Centre represent a majority of total ArchSD office space. In the calculation process, ArchSD offices at APB Centre and QGO are assumed to consume 100% and 20% of the water of the whole premises, respectively. From 2020 to 2021, the water consumption was adjusted.

Unit20182019202020212022
A4 paper consumptionReam16,13616,53417,24916,48615,199
A3 paper consumptionReam1,1241,2471,2521,3851,223
Envelope consumptionNo.29,71834,20327,41536,78437,340

Unit20182019202020212022
Construction & demolition (C&D) materials
C&D waste to landfillsTonne57,57143,97047,76842,04744,980
C&D materials to public landfill areasTonne679,910745,343839,544799,0661,199,771
Recyclable waste collected at APB Centre
Waste paperkg12,0948,2438,1197,8007,537
AluminiumNo.1,9854,5603,8715,5696,354
Plastic bottlesNo.3,9187,0714,2376,2098,536

Unit20182019202020212022
Convictions[8] per 100,000 man-hoursArchSD sites
(HK sites)
0.032
(0.192)
0.374
(0.197)
0.118
(0.087)
0.037
(0.065)
0.000
(0.137)
Monetary value of finesHK$25,000112,00022,0002,0000
[8]

‘Environmental convictions’ refers to instances of non-compliance associated with the environment, including, but not limited to, violations of permits, standards, and/or regulations associated with waste, air quality and/or emissions, water discharges and hazardous spills.

[9]

Staff data are extracted from the records kept in the personnel section.

[10]

According to DEVB’s Guidelines for Integrity Training Workshop dated 16 July 2018, a 5-year training cycle has been adopted for ArchSD staff to receive integrity training at regular intervals. In the 5-year cycle from 2018 to 2022, a total of 20 directorate grade staff, 419 professional grade staff and 847 technical grade, site supervisory and general grade staff have received integrity training.

[11]

‘Workers’ refers to persons who are not employees but whose work and/or workplace is controlled by ArchSD. Contractors' staff directly employed and controlled by the contractors are excluded from this disclosure.

[12]

‘Staff injury cases’ refers to reported cases of occupational injuries under the Employee's Compensation Ordinance, resulting in death or incapacity for work over 3 days.

[13]

Total man-hours in 2018 to 2022 was extracted from PWP Construction Site Safety and Environmental Statistics System (PCSES) of DEVB. In the calculation process, each worker is assumed to work for 9 hours per working day in every year.

[14]

Data from 2022 and previous years were extracted from the PWP Construction Site Safety and Environmental Statistics System (PCSES) of DEVB as at 30 Aug 2023. From 2018 to 2021, the number of non-fatal accidents and the non-fatal accident rate was adjusted.

[15]

The accident rate of the Hong Kong Construction Industry is based on the published statistics of the Labour Department, using a conversion of 1.67 accidents per 100,000 man-hours, which is equivalent to 60 accidents per 1,000 workers per year.